Monday morning and it's a 9am start, we return to site to find that Sunday's wet weather has filled our trenches with water and crumbled the neat edges that we'd carefully prepared the previous day.
With thanks to Keepmoat we received our concrete delivery at midday and quickly set about laying our foundations, spreading and shovelling the mix along the trench.
Moving the concrete to create a level foundation, Miles, Ryan, Matt H and Phil scrape the mix along the line.
More concrete is poured into the hexagon and is tamped to give the flat surface.
After much effort the concrete is got into the right places and is spread evenly throughout, it is left to cure for the remainder of the day and will hopefully have set by this time tomorrow.
The next job is to clean the tools as no one wants concrete clogging up their tools.
Phil makes sure that his boots are returned to the clean and sparkly condition.
About This Live Project
The Spires is a community building based on the Arbourthorne council estate to the south-east of Sheffield city centre. The building itself is very distinctive, formed by 13 hexagonal pods each rising to an individual apex. A local Christian charity known as the Miracle Trust are using the building to provide a much needed community support network. The hope is to extend the reach of the organisation and its valuable resource to a greater number of people by improving the public face of the building and providing a clearer connection to the community.
Monday, 27 October 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment